Precision tooling. Global reach.
Precision Injection Molds for Consumer Electronics & Small Plastic Parts
High-precision injection molds built in Kunshan, China. Exporting to 50+ countries, including the US, Europe, Australia and Japan. Industry-leading lead times.
- ISO 9001 Certified
- Quotes Within 48 Hours
- Industry-Leading Lead Times
- 8+Years in Tooling
- 110+Employees
- 50+Export Countries
- ISO 9001Certified
570+ Molds per Year
Fastest T1: 2–4 weeks
Why NorthMold
Precision molds. A dependable partner.
Move from drawing to production-ready tooling with fast answers, practical engineering and a clear view of progress.
Fast Turnaround
Our fastest tooling projects reach T1 samples in 2–4 weeks. We confirm the schedule around your project requirements.
Proven in Export Markets
Exporting to 50+ countries, including the US, Europe, Australia and Japan.
Full Transparency
Weekly progress reports with photos. A video of every mold trial before shipping.
Quotes in 48 Hours
Send your drawing and get a DFM review and quote within 48 hours.
Built for your application
Small details.
Strong tooling solutions.
From high-gloss electronic housings to precision gears and two-material parts, we build molds that bring your design into production.
- Single-cavity molds
- Multi-cavity molds
- Hot runner molds
- Cold runner molds
- Insert molds
- Overmolding
- Two-shot / 2K molds
- Mold flow analysis
- Micro-precision tooling

How we work
From your drawing to a mold ready to run.
Our engineering team guides each stage, with DFM, mold flow analysis, weekly progress reports and documented trial results.
- 01
Drawing & Quote
We review your drawing and send a tooling quote within 48 hours.
- 02
DFM & Mold Flow
We send a DFM report and use mold flow analysis to refine filling, gating and cooling.
- 03
Design Approval
We develop the mold design around your part, resin and molding machine, then confirm it with you.
- 04
Tooling & Updates
We machine and assemble your mold, sharing weekly progress reports with photos.
- 05
Trial & Inspection
We run the mold trial and provide the trial video, T1 samples and dimensional inspection report.
- 06
Shipping & Handover
We prepare the mold for shipment and hand over the tooling documents for your molding team.
From drawing to tooling
Move your next mold into production.
Send your drawing — get a DFM review and quote within 48 hours.